Australia’s GO Scheme: What You Need to Know as LGCs Begin to Wind Down
- Sid Bansal
- November 18, 2025
- Articles
As advisors who help clients navigate Australia’s energy and carbon compliance frameworks, we’ve been watching the rollout of the Australian Government’s Guarantee of Origin (GO)A Guarantee of Origin (GO) is a European energy certificate that verifies electricity has been generated from a specific renewable source. GOs are used to track and substantiate renewable electricity claims and are the European equivalent of Renewable Energy Certificates (RECs). They can be traded independently of electricity and are widely used by RE100 companies to meet renewable energy targets. Scheme closely. For many organisations – particularly those engaged in renewable electricity, industrial decarbonisation or exports – the GO Scheme is more than just a regulatory update. It’s a shift in how environmental credentials will be tracked and verified.
We’re often asked: What’s replacing LGCs? and Do I need to act now? Here’s what you need to know.
What is the GO Scheme?
The GO Scheme is a new federal certification framework designed to succeed the Large-scale Generation Certificate (LGCLarge-scale Generation Certificate under the Australian Renewable Energy Target. More) regime. It includes:
- REGO certificates: Renewable Electricity Guarantee of Origin, certifying each megawatt-hour of eligible renewable electricity.
- PGO certificates: Product Guarantee of Origin, certifying low-emissions products like hydrogen, and eventually metals and fuels.
The scheme, part of the Future Made in Australia plan, was formally launched on 3 November 2025. It aims to provide transparent, government-backed certification that aligns with global expectations.
Why It Matters
- LGCs end in 2030: With the LGC scheme closing 31 December 2030, REGO is the likely successor. If LGCs are part of your current compliance or revenue model, it’s time to start planning your transition.
- REGO and LGCs will overlap: From now until 2030, both schemes will operate concurrently. You cannot issue both for the same MWh – you must choose one although your system can be registered for both.
- PGOs create new market opportunities: Especially for hydrogen producers and exporters, PGOs allow you to verify embedded emissions – a growing global requirement. Although these certificates will not be tradable.
This is your chance to do more with less risk, aligning early with the new framework.
What’s New About REGO?
- Broader eligibility: REGO includes storage and hybrid systems, expanding participation.
- Greater transparency: Certificates include detailed data – time, source and location – enabling more accurate Scope 2 accounting.
- No dual claiming: LGCs and REGOs cannot be issued for the same MWh.
This enables you to do more with less confusion, with simpler compliance and clearer reporting.
What About PGOs?
PGO certification will be valuable if you:
- Export hydrogen or energy-intensive goods
- Need verified low-emissions data for supply chains or reporting
- Want to stay ahead of carbon border adjustments or green procurement policies
By acting early, you can do more with less exposure to shifting international standards.
What We’re Helping Clients With
At Northmore Gordon, we’re already supporting:
- REGO registrations: Preparing renewable projects for participation
- Contract strategy: Integrating REGOs into PPAs and disclosures
- PGO readiness: Emissions baselining and documentation for low-emissions products
- Internal training: Helping teams understand GO certificates and use them effectively
This lets our clients do more with less admin and unlock greater strategic value from compliance.
What You Should Do Now
- Understand the new framework: The GO Scheme is live. Start aligning internal systems and teams.
- Assess LGC reliance: Begin your transition plan if LGCs play a role in your strategy.
- Engage your supply chain: Ask upstream partners if they’re GO certified.
- Update reporting systems: REGOs and PGOs support ESG and Scope 2/3 reporting – if managed well.
It’s time to do more with less uncertainty, by planning now for what’s coming next.
Our Take
The GO Scheme is a credible evolution in Australia’s renewable certification and decarbonisation story. It creates new commercial and compliance advantages for businesses that engage early.
We’re here to help you make the most of it – through tailored advisory, technical support and practical strategy. If you want to do more with less complexity and stay ahead of the curve, let’s talk.
For more information call or email s.bansal@northmoregordon.com
You may also like:
Welcome to our August & September 2026 Compliance Update.
Australian Certificate Markets – August 2026 Update
Where’s the value in renewable heat?
Latest Updates
ASRS Group 3: are you in scope and don’t know it?
September 18, 2026Correct as at 13 September 2026. If your company is a large proprietary company, you
Read More »Beyond annual matching: The evolution of time-stamped RECs
August 18, 2026For more than a decade, Renewable Energy Certificates (RECsI-RECs, GOs, TIGRsTradeable Instrument for Global Renewables (TIGR) Registry is an online platform for tracking and transferring renewable energy certificates (RECS), enabling developers to generate,verify and sell RECs. The registry is run by APX, a US company that provides infrastructure for environmental markets around the world., LGCs, ZNECs, J-Credits) have
Read More »Solar irrigation upgrades: Don’t let certificate funding go unclaimed
August 10, 2026Irrigation pumps are one of the biggest hidden costs on an Australian farm. In particular, if
Read More »SRES expansion: STC eligibility to increase from 100 kW to 1 MW from October 2026
August 6, 2026The Australian Government has announced a major expansion of the Small-scale Renewable Energy Scheme, increasing
Read More »Get in touch
Australia
1300 854 561 (Advisory)
1300 878 500 (Certificates)
Melbourne
Suite 1, Level 4
607 Bourke Street
Melbourne
VIC 3000
Singapore
Singapore
1 Keong Saik Road,
Singapore 089109
Stay up to date
mailto:%20info@northmoregordon.com https://twitter.com/northmoregordon https://www.linkedin.com/company/northmore-gordon-pty-ltd https://www.youtube.com/channel/UCdGc6mABpL2XxVUCrVjYQ1gAlternatively, complete the form and we will be in
touch with you.
Services
- Energy Audit Services
- M&V Services
- EEO Assessments
- Corporate Energy and Carbon Management
- Grants and Program
- Strategic Energy Sourcing
- Virtual Energy Manager
- Climate Active Certification
Sectors
- Animal Processing
- Chemical Processing
- Commercial Buildings
- Food & Beverage
- Manufacturing
- Mining
- Oil & Gas
- Pharmaceutical & Health Products
- Public Sector
- Waste & Wastewater
- Wood, Paper & Cardboard Processing
Upgrades
- Boiler Upgrades
- Commercial Lighting
- Hot Water Systems
- Mid Scale Solar
- NABERS
- Public Lighting
- Refrigerated Display Cabinets
- Solar PV Small Scale
- UPS
Certificates
- Live Certificate Prices
- International Renewable Energy Certificates
- Tradable Instrument for Global Renewables
- Australian Carbon Credit Units
- Energy Savings Certificates
- Large-scale Generation Certificates
- Small-scale Technology Certificates
- Victorian Energy Efficiency Certificates
Government Schemes
Helpful Links
What is Australia's GO Scheme?
The GO Scheme (Guarantee of Origin Scheme) is a new federal certification framework in Australia designed to succeed the Large-scale Generation Certificate (LGC) regime. It is part of the Future Made in Australia plan and provides transparent, government-backed certification of environmental credentials, aligning with global expectations. It was formally launched on 3 November 2025.
What are REGO certificates?
REGO stands for Renewable Electricity Guarantee of Origin. These certificates certify each megawatt-hour of eligible renewable electricity and are considered the likely successor to Large-scale Generation Certificates (LGCs).
What are PGO certificates?
PGO stands for Product Guarantee of Origin. These certificates certify low-emissions products such as hydrogen, and eventually metals and fuels, allowing businesses to verify embedded emissions. PGOs will not be tradable.
When do LGCs end and what happens to the GO Scheme in the meantime?
The LGC scheme closes on 31 December 2030. From now until then, REGO and LGCs will operate concurrently, but you cannot issue both certificates for the same MWh — you must choose one, although your system can be registered for both.
What new features does REGO offer compared to LGCs?
According to Northmore Gordon, REGO offers broader eligibility (including storage and hybrid systems), greater transparency (certificates include detailed data on time, source and location for more accurate Scope 2 accounting), and no dual claiming — LGCs and REGOs cannot be issued for the same MWh.
Who would benefit from PGO certification?
PGO certification is valuable for organisations that export hydrogen or energy-intensive goods, need verified low-emissions data for supply chains or reporting, or want to stay ahead of carbon border adjustments or green procurement policies.
What services is Northmore Gordon offering clients regarding the GO Scheme?
Northmore Gordon is helping clients with REGO registrations (preparing renewable projects for participation), contract strategy (integrating REGOs into PPAs and disclosures), PGO readiness (emissions baselining and documentation for low-emissions products), and internal training to help teams understand and use GO certificates effectively.
What steps does Northmore Gordon recommend businesses take now regarding the GO Scheme?
Northmore Gordon recommends businesses understand the new framework and start aligning internal systems and teams, assess their reliance on LGCs and begin a transition plan if relevant, engage their supply chain by asking upstream partners if they are GO certified, and update reporting systems since REGOs and PGOs support ESG and Scope 2/3 reporting.
Who wrote the article on Australia's GO Scheme for Northmore Gordon, and when was it published?
The article was written by Sid Bansal and published on November 18, 2025.
How can someone get more information about the GO Scheme from Northmore Gordon?
For more information, readers can call or email Sid Bansal at s.bansal@northmoregordon.com.
Images on This Page
-
https://px.ads.linkedin.com/collect/?pid=3718913&fmt=gif
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2020/05/ng-logo.svg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/06/cropped-Northmore_Gordon_Siddharth_Bansal-96x96.jpg
Picture of Sid Bansal
-
https://northmoregordon.com/wp-content/uploads/2025/11/Australias-GO-Scheme_WEB.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2025/11/Compliance-Update-–-November-2025-300x139.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2025/11/Markets-update-news-WEB-300x139.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2025/08/Renewable-Heat-banner-300x139.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/09/shutterstock_2761180357.jpg
ASRS Group 3: Are you in scope and don't know it - ASRS Reporting Standards - Northmore Gordon
-
https://northmoregordon.com/wp-content/uploads/2026/08/Time-stamped-RECs.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/08/Solar-Irrigation.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2025/10/Earn-more-from-CI-solar-WEB.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2020/05/ng-logo.png
(no alt text)