Biomass boiler heats greenhouses through the VEU program: Van Wyk Flowers

With the unpredictable price rises surrounding natural gas, the move to this renewable energy (renewable biomass from waste wood which is part of the natural carbon cycle) is not just great for our bottom line, but even more importantly, has allowed us to reduce our carbon (CO2) footprint by a massive margin. Wattly and Northmore Gordon provided a very professional service and the value from the VEUVictorian Energy Upgrades is a Victorian government energy efficiency program that gives every Victorian household and business the opportunity to receive rebates or discounts on energy saving products. significantly contributed to the capital costs reducing the payback. – Paul Purcell, Van Wyk Flower Supply Pty Ltd

The Client

Van Wyk Flower Supply Pty Ltd is a longstanding family owned cutflower/plant farm based southwest of Melbourne. For many years they have grown and sold produce to the flower industry. The intense horticulture used a large amount electricity and natural gas and Van Wyk had already invested in a 350 kW solar system to help power irrigation and onsite functions. Heating is a necessary component of growing to ensure the consistency in quality and numbers. To heat the expansive glasshouse areas the farm had two natural gas boilers (total 7MW) and were looking for alternative solutions.

Key Facts

The Project

Industry leaders in biomass boilers and energy systems (Enriva Pty Ltd) delivered substantial energy savings by replacing the existing gas-fired boilers to a single 2.95MW biomass plant fuelled by timber residues from Victorian forestry & timber operations. Through a network of heating pipes, the boiler runs continuously and feeds hot water into a large insulated buffer (2,000,000 litre tank). This is a highly innovative and important part of the solution. The tank acts as a large thermal battery allowing the system to deliver very high peak loads and is drawn down overnight and during cold weather.

Challenges

Outcomes

Our Role

Wattly and Northmore Gordon provided an end to end service to ensure the project compiled with the Victorian Energy Upgrade Program to maximise the financial incentives. Northmore Gordon’s Certified Measurement & Verification Professionals (CMVPs) created the M&V plan, collected site data & supporting evidence, and built the baseline amd operating energy models to calculate the energy savings. Subsequently we wrote the M&V report, then created and traded the VEECs on behalf of the client.

A family-owned cut-flower farm in Lyndhurst, Victoria, specialising in sustainably grown seasonal flowers for wholesale markets across Australia.

Industry

Horticulture

Location

Lyndhurst, Victoria

Hamish McGovern

Group Managing Director

Contact Hamish ›

You may also like:

Case Studies

Turning a Regional Utility into an Active Energy Market Participant

Case Studies

Visy Gibson Island: 34,000 t CO2‑e Cut a Year With Waste‑to‑Energy

Case Studies

MainStream Aquaculture: $19K Grant funds a heat pump electrification project

Case Studies

Kalafatis Fresh Produce: $283K in Solar Certificates

Case Studies

Poultry Client Set to Hit 2030 & 2050 Carbon Emissions Targets

Case Studies

Greenham: Moving Towards Decarbonisation

Get in touch

Australia

1300 854 561 (Advisory)

1300 878 500 (Certificates)

Melbourne

Suite 1, Level 4

607 Bourke Street

Melbourne

VIC 3000

Singapore

+65 6690 2480



Singapore

1 Keong Saik Road,

Singapore 089109

Stay up to date

mailto:%20info@northmoregordon.com https://twitter.com/northmoregordon https://www.linkedin.com/company/northmore-gordon-pty-ltd https://www.youtube.com/channel/UCdGc6mABpL2XxVUCrVjYQ1g

Alternatively, complete the form and we will be in

touch with you.

https://northmoregordon.com
Services
Sectors
Upgrades
Certificates
Government Schemes
Helpful Links

Images on This Page